SE Croco Road Pavement Replacement Project

  • Roadway Repair
  • Surveying
  • Transportation Engineering

Project Overview

Year completed: 2022

Construction Cost: $266,400

Location: Shawnee County, KS

SBB Engineering collaborated with Shawnee County and Terracon on the SE Croco Pavement Replacement Project. The existing concrete pavement was severely deteriorated due to heavy truck traffic and D-cracking. The project offered a bid alternate for either 9” concrete or 10” asphalt pavement on a 12” cement-treated subgrade. SBB, alongside Terracon, conducted the construction inspection. The project was completed on schedule in the summer of 2022 without any change orders.

Project Successes

  • Cement treated base subgrade
  • Bid alternate – concrete vs. asphalt pavement
  • Temporary traffic control
  • Completed on schedule without a change order